The INTERIM State Theatre Kassel was realized within approximately 18 months as a high-performance temporary venue. The project serves as a replacement facility during the renovation of the historic opera house and stands as a strong example of the integration between modular construction and advanced building services engineering.
The project required exceptional levels of functionality, flexibility and technical precision. The objective was to deliver, within a short timeframe, a reliable infrastructure capable of supporting uninterrupted theatre operations.